---
title: "Engineering Data Consistency Across Systems | Assai Enterprise"
description: "Assai Enterprise verifies that engineering changes are fully implemented across documents and assets, ensuring reliable and complete data across systems."
url: "https://assai-software.com/platform/assai-enterprise/"
---

# Assai Enterprise

Bringing Insight and Control Across Your Existing Data Systems

[Request a 20-Minute Walkthrough](https://assai-software.com/book-demo-assai/) [Download overview](https://assai.activehosted.com/content/7Dk4A/2025/11/24/5e32b9cc-701d-4c5c-ab39-eb378c6063d0.pdf)

1. [Home](https://assai-software.com/)
2. [Platform](https://assai-software.com/platform/)
3. Assai Enterprise

## Introducing Assai Enterprise

Assai Enterprise provides a control layer across engineering and asset systems, ensuring that engineering information remains aligned and reliable across your entire system landscape.

It creates a single, trusted view of asset information, so teams can clearly see what is complete, what is missing, and what can be safely relied on.

For example, a change may be updated in engineering documentation but not reflected in maintenance systems.

This disconnect between approved changes and actual implementation is the **Engineering Gap**.

## The Engineering Gap

Engineering information is spread across multiple systems, where each system reflects only part of the asset.

Updates are often applied in one system but missed in another, causing systems to diverge and data to become incomplete and inconsistent.

## Complete and Reliable Engineering Information

Without coordination, updates are often applied partially, leaving gaps between what is approved and what is actually implemented.

Complete and reliable information means that data is consistent across systems and safe to rely on for operations, handover, and compliance.

![Identify](https://assai-software.com/wp-content/uploads/2026/10/ent-identify.webp)

### Identify

![Track](https://assai-software.com/wp-content/uploads/2026/10/ent-track.webp)

### Track

![Coordinate](https://assai-software.com/wp-content/uploads/2026/10/ent-coordinate.webp)

### Coordinate

![Verify](https://assai-software.com/wp-content/uploads/2026/10/ent-verify.webp)

### Verify

## Outcomes of Consistent and Verified Engineering Data

![Faster handovers with complete and verified information](data:image/svg+xml,%3Csvg id=%22Layer_1%22 xmlns=%22http://www.w3.org/2000/svg%22 version=%221.1%22 xmlns:xlink=%22http://www.w3.org/1999/xlink%22 viewBox=%220.231 0.231 23.538 23.538%22 fill=%22url(%23wss-icon-fill)%22%3E%3Cdefs%3E%3ClinearGradient id=%22wss-icon-fill%22 x1=%224%22 y1=%2222%22 x2=%2220%22 y2=%222%22 gradientUnits=%22userSpaceOnUse%22%3E%3Cstop offset=%220%22 stop-color=%22%231506bf%22/%3E%3Cstop offset=%221%22 stop-color=%22%23ea6c32%22/%3E%3C/linearGradient%3E%3C/defs%3E%0A %3C!-- Generator: Adobe Illustrator 30.3.0%2C SVG Export Plug-In . SVG Version: 2.1.3 Build 182) --%3E%0A %3Cdefs%3E%0A %3Cstyle%3E%0A .st0 %7B%0A fill:url(%23wss-icon-fill)%3B%0A %7D%0A %3C/style%3E%0A %0A %3C/defs%3E%0A %3Cpath class=%22st0%22 d=%22M10.55%2C18.2l5.18-6.2h-4l.73-5.68-4.63%2C6.68h3.48l-.75%2C5.2ZM8%2C22l1-7h-5L13%2C2h2l-1%2C8h6l-10%2C12h-2Z%22/%3E%0A%3C/svg%3E)

### Faster handovers with complete and verified information

![Consistent and accurate data across documents, asset records, and systems](data:image/svg+xml,%3Csvg id=%22Layer_1%22 xmlns=%22http://www.w3.org/2000/svg%22 version=%221.1%22 xmlns:xlink=%22http://www.w3.org/1999/xlink%22 viewBox=%220.208 0.168 23.595 23.595%22 fill=%22url(%23wss-icon-fill)%22%3E%3Cdefs%3E%3ClinearGradient id=%22wss-icon-fill%22 x1=%222%22 y1=%2220%22 x2=%2222.01%22 y2=%223.93%22 gradientUnits=%22userSpaceOnUse%22%3E%3Cstop offset=%220%22 stop-color=%22%231506bf%22/%3E%3Cstop offset=%221%22 stop-color=%22%23ea6c32%22/%3E%3C/linearGradient%3E%3C/defs%3E%0A %3C!-- Generator: Adobe Illustrator 30.3.0%2C SVG Export Plug-In . SVG Version: 2.1.3 Build 182) --%3E%0A %3Cdefs%3E%0A %3Cstyle%3E%0A .st0 %7B%0A fill:url(%23wss-icon-fill)%3B%0A %7D%0A %3C/style%3E%0A %0A %3C/defs%3E%0A %3Cpath class=%22st0%22 d=%22M14.4%2C20l-1.4-1.4%2C2.6-2.6-2.6-2.6%2C1.4-1.4%2C2.6%2C2.6%2C2.6-2.6%2C1.4%2C1.4-2.6%2C2.6%2C2.6%2C2.6-1.4%2C1.4-2.6-2.6-2.6%2C2.6ZM16.38%2C11l-3.55-3.55%2C1.4-1.4%2C2.13%2C2.13%2C4.25-4.25%2C1.4%2C1.43-5.63%2C5.65ZM2%2C17v-2h9v2H2ZM2%2C9v-2h9v2H2Z%22/%3E%0A%3C/svg%3E)

### Consistent and accurate data across documents, asset records, and systems

![Reduced rework caused by incomplete or inconsistent updates](data:image/svg+xml,%3Csvg id=%22Layer_1%22 xmlns=%22http://www.w3.org/2000/svg%22 version=%221.1%22 xmlns:xlink=%22http://www.w3.org/1999/xlink%22 viewBox=%22-0.481 -0.486 24.972 24.972%22 fill=%22url(%23wss-icon-fill)%22%3E%3Cdefs%3E%3ClinearGradient id=%22wss-icon-fill%22 x1=%222%22 y1=%2221%22 x2=%2222.01%22 y2=%223%22 gradientUnits=%22userSpaceOnUse%22%3E%3Cstop offset=%220%22 stop-color=%22%231506bf%22/%3E%3Cstop offset=%221%22 stop-color=%22%23ea6c32%22/%3E%3C/linearGradient%3E%3C/defs%3E%0A %3C!-- Generator: Adobe Illustrator 30.3.0%2C SVG Export Plug-In . SVG Version: 2.1.3 Build 182) --%3E%0A %3Cdefs%3E%0A %3Cstyle%3E%0A .st0 %7B%0A fill:url(%23wss-icon-fill)%3B%0A %7D%0A %3C/style%3E%0A %0A %3C/defs%3E%0A %3Cpath class=%22st0%22 d=%22M7%2C21l-5-5%2C5-5%2C1.43%2C1.4-2.6%2C2.6h15.18v2H5.83l2.6%2C2.6-1.43%2C1.4ZM17%2C13l-1.43-1.4%2C2.6-2.6H3v-2h15.18l-2.6-2.6%2C1.43-1.4%2C5%2C5-5%2C5Z%22/%3E%0A%3C/svg%3E)

### Reduced rework caused by incomplete or inconsistent updates

![Clear, traceable records for audits and compliance](data:image/svg+xml,%3Csvg id=%22Layer_1%22 xmlns=%22http://www.w3.org/2000/svg%22 version=%221.1%22 xmlns:xlink=%22http://www.w3.org/1999/xlink%22 viewBox=%220.155 0.15 23.691 23.691%22 fill=%22url(%23wss-icon-fill)%22%3E%3Cdefs%3E%3ClinearGradient id=%22wss-icon-fill%22 x1=%223%22 y1=%2221%22 x2=%2221%22 y2=%222.99%22 gradientUnits=%22userSpaceOnUse%22%3E%3Cstop offset=%220%22 stop-color=%22%231506bf%22/%3E%3Cstop offset=%221%22 stop-color=%22%23ea6c32%22/%3E%3C/linearGradient%3E%3C/defs%3E%0A %3C!-- Generator: Adobe Illustrator 30.3.0%2C SVG Export Plug-In . SVG Version: 2.1.3 Build 182) --%3E%0A %3Cdefs%3E%0A %3Cstyle%3E%0A .st0 %7B%0A fill:url(%23wss-icon-fill)%3B%0A %7D%0A %3C/style%3E%0A %0A %3C/defs%3E%0A %3Cpath class=%22st0%22 d=%22M12%2C21c-2.3%2C0-4.3-.76-6.01-2.29-1.71-1.53-2.69-3.43-2.94-5.71h2.05c.23%2C1.73%2C1%2C3.17%2C2.31%2C4.3%2C1.31%2C1.13%2C2.84%2C1.7%2C4.59%2C1.7%2C1.95%2C0%2C3.6-.68%2C4.96-2.04%2C1.36-1.36%2C2.04-3.01%2C2.04-4.96s-.68-3.6-2.04-4.96-3.01-2.04-4.96-2.04c-1.15%2C0-2.23.27-3.23.8s-1.84%2C1.27-2.53%2C2.2h2.75v2H3V4h2v2.35c.85-1.07%2C1.89-1.89%2C3.11-2.48s2.52-.88%2C3.89-.88c1.25%2C0%2C2.42.24%2C3.51.71s2.04%2C1.12%2C2.85%2C1.93%2C1.45%2C1.76%2C1.93%2C2.85.71%2C2.26.71%2C3.51-.24%2C2.42-.71%2C3.51-1.12%2C2.04-1.93%2C2.85c-.81.81-1.76%2C1.45-2.85%2C1.93s-2.26.71-3.51.71ZM14.8%2C16.2l-3.8-3.8v-5.4h2v4.6l3.2%2C3.2-1.4%2C1.4Z%22/%3E%0A%3C/svg%3E)

### Clear, traceable records for audits and compliance

![Reliable data for operations, analytics, and AI](data:image/svg+xml,%3Csvg id=%22Layer_1%22 xmlns=%22http://www.w3.org/2000/svg%22 version=%221.1%22 xmlns:xlink=%22http://www.w3.org/1999/xlink%22 viewBox=%22-1.181 -1.181 26.342 26.342%22 fill=%22url(%23wss-icon-fill)%22%3E%3Cdefs%3E%3ClinearGradient id=%22wss-icon-fill%22 x1=%221.98%22 y1=%2222%22 x2=%2222%22 y2=%221.98%22 gradientUnits=%22userSpaceOnUse%22%3E%3Cstop offset=%220%22 stop-color=%22%231506bf%22/%3E%3Cstop offset=%221%22 stop-color=%22%23ea6c32%22/%3E%3C/linearGradient%3E%3C/defs%3E%0A %3C!-- Generator: Adobe Illustrator 30.3.0%2C SVG Export Plug-In . SVG Version: 2.1.3 Build 182) --%3E%0A %3Cdefs%3E%0A %3Cstyle%3E%0A .st0 %7B%0A fill:url(%23wss-icon-fill)%3B%0A %7D%0A %3C/style%3E%0A %0A %3C/defs%3E%0A %3Cpath class=%22st0%22 d=%22M10%2C16c1.67%2C0%2C3.08-.58%2C4.25-1.75s1.75-2.58%2C1.75-4.25-.58-3.08-1.75-4.25-2.58-1.75-4.25-1.75-3.08.58-4.25%2C1.75c-1.17%2C1.17-1.75%2C2.58-1.75%2C4.25s.58%2C3.08%2C1.75%2C4.25c1.17%2C1.17%2C2.58%2C1.75%2C4.25%2C1.75ZM9%2C13v-7h2v7h-2ZM5.5%2C13v-5h2v5h-2ZM12.5%2C13v-4h2v4h-2ZM20.6%2C22l-5.68-5.68c-.68.53-1.44.95-2.28%2C1.24-.83.29-1.72.44-2.65.44-2.23%2C0-4.13-.78-5.68-2.33s-2.33-3.44-2.33-5.68.78-4.13%2C2.33-5.68%2C3.44-2.33%2C5.68-2.33%2C4.13.78%2C5.68%2C2.33%2C2.33%2C3.44%2C2.33%2C5.68c0%2C.93-.15%2C1.82-.44%2C2.65s-.7%2C1.59-1.24%2C2.28l5.68%2C5.68-1.4%2C1.4Z%22/%3E%0A%3C/svg%3E)

### Reliable data for operations, analytics, and AI

![Improved confidence in what is complete, approved, and safe to rely on](data:image/svg+xml,%3Csvg xmlns=%22http://www.w3.org/2000/svg%22 xmlns:xlink=%22http://www.w3.org/1999/xlink%22 id=%22Layer_1%22 viewBox=%220.231 0.231 23.538 23.538%22 fill=%22url(%23wss-icon-fill)%22%3E%3Cdefs%3E%3ClinearGradient id=%22wss-icon-fill%22 x1=%224%22 y1=%2222%22 x2=%2220%22 y2=%222%22 gradientUnits=%22userSpaceOnUse%22%3E%3Cstop offset=%220%22 stop-color=%22%231506bf%22/%3E%3Cstop offset=%221%22 stop-color=%22%23ea6c32%22/%3E%3C/linearGradient%3E%3C/defs%3E%3Cdefs%3E%3Cstyle%3E .st0 %7B fill:url(%23wss-icon-fill)%3B %7D %3C/style%3E%3C/defs%3E%3Cpath class=%22st0%22 d=%22M12%2C22c-2.32-.58-4.23-1.91-5.74-3.99-1.51-2.08-2.26-4.38-2.26-6.91v-6.1L12%2C2l8%2C3v6.1c0%2C2.53-.75%2C4.84-2.26%2C6.91s-3.42%2C3.4-5.74%2C3.99ZM12%2C19.9c1.62-.5%2C2.97-1.49%2C4.05-2.96s1.72-3.12%2C1.9-4.94h-5.95v-7.88l-6%2C2.25v5.18c0%2C.12.02.27.05.45h5.95v7.9Z%22%3E%3C/path%3E%3C/svg%3E)

### Improved confidence in what is complete, approved, and safe to rely on

## Understanding dependencies across systems and data

Engineering data is connected across documents, asset records, and engineering systems, even when managed separately.

Assai Enterprise maintains these relationships across systems, allowing organisations to understand what is affected, track dependencies, and ensure updates are applied consistently.

These dependencies span multiple systems and organisations across the asset lifecycle, making consistency difficult to maintain without coordinated control.

![assai dms logo](https://assai-software.com/wp-content/uploads/2026/11/assai-dms-logo.webp)

![assai viewport logo](https://assai-software.com/wp-content/uploads/2026/11/assai-viewport-logo.webp)

Assai Enterprise works across Assai DMS, Assai Viewport, and your existing systems to maintain alignment across the entire environment.

## Powered by the Assai Data Platform

Built on the Assai Data Platform, Assai Enterprise connects and consolidates engineering data across existing systems, creating a single trusted view of asset information. It continuously identifies gaps, inconsistencies, and missing updates, ensuring that engineering changes are fully implemented and verified across all platforms.

By eliminating data silos and manual reconciliation, Assai Enterprise provides real-time visibility into data quality and completeness. The result is greater control, reduced risk, and confidence that engineering information remains accurate, aligned, and ready to support operations, compliance, and digital initiatives.

01

### Identify what must change

Determine which systems, documents, and data are affected by each change.

02

### Define and track required updates

Maintain a clear view of what needs to be updated across systems.

03

### Coordinate execution across systems

Align updates across teams, tools, and platform for consistency.

04

### Verify completion before closure

Confirm all updates are complete and consistent across systems.

## Who Needs Control Across Engineering Systems

**Engineering managers** responsible for change implementation and handover

**Document controllers** managing structured approvals and document updates

**Operations leaders** relying on accurate, up-to-date asset data

**Digital transformation leads** responsible for data integrity across systems

**Business owners** accountable for risk related to incomplete or inconsistent changes

## Built for Complex Engineering Environments

Assai Enterprise is designed for environments where engineering information spans multiple systems and must remain consistent over time. It provides a reliable foundation for digital initiatives and AI by ensuring engineering information is consistent, accessible, and complete.

- Integrates with SAP, Maximo, AVEVA PI, SharePoint, and other systems
- SOC 2 Type II compliant with enterprise-grade access control
- Cloud-based deployment designed to operate across systems and teams
- Works across existing systems in a vendor-independent way without requiring replacement or data migration

## Built for Asset-Intensive Industries

Explore how Assai supports the engineering information needs of your industry.

![Oil and Gas](data:image/svg+xml,%3Csvg xmlns=%22http://www.w3.org/2000/svg%22 xmlns:xlink=%22http://www.w3.org/1999/xlink%22 id=%22Layer_1%22 viewBox=%220.346 0.296 39.408 39.408%22 fill=%22url(%23wss-icon-fill)%22%3E%3Cdefs%3E%3ClinearGradient id=%22wss-icon-fill%22 x1=%225.1%22 y1=%2235%22 x2=%2235%22 y2=%225%22 gradientUnits=%22userSpaceOnUse%22%3E%3Cstop offset=%220%22 stop-color=%22%231506bf%22/%3E%3Cstop offset=%221%22 stop-color=%22%23ea6c32%22/%3E%3C/linearGradient%3E%3C/defs%3E%3Cdefs%3E%3Cstyle%3E .st0 %7B fill:url(%23wss-icon-fill)%3B %7D %3C/style%3E%3C/defs%3E%3Cpath class=%22st0%22 d=%22M6.7%2C35c-.4%2C0-.7-.1-1-.4-.3-.3-.4-.6-.4-1%2C0-.4.1-.7.4-1%2C.3-.3.6-.4%2C1-.4h1.7v-10.8h-1.9c-.4%2C0-.7-.1-1-.4-.3-.3-.4-.6-.4-1s.1-.7.4-1c.3-.3.6-.4%2C1-.4h1.9V7.8h-1.7c-.4%2C0-.7-.1-1-.4-.3-.3-.4-.6-.4-1%2C0-.4.1-.7.4-1s.6-.4%2C1-.4h26.7c.4%2C0%2C.7.1%2C1%2C.4.3.3.4.6.4%2C1s-.1.7-.4%2C1c-.3.3-.6.4-1%2C.4h-1.7v10.8h1.9c.4%2C0%2C.7.1%2C1%2C.4.3.3.4.6.4%2C1s-.1.7-.4%2C1c-.3.3-.6.4-1%2C.4h-1.9v10.8h1.7c.4%2C0%2C.7.1%2C1%2C.4.3.3.4.6.4%2C1s-.1.7-.4%2C1c-.3.3-.6.4-1%2C.4H6.7ZM20%2C26.3c1.3%2C0%2C2.4-.5%2C3.3-1.4.9-.9%2C1.4-2%2C1.4-3.3s-.3-1.9-.9-2.6c-.6-.7-1.9-2.2-3.8-4.5-2%2C2.3-3.3%2C3.8-3.8%2C4.5-.6.7-.9%2C1.6-.9%2C2.6%2C0%2C1.3.5%2C2.4%2C1.4%2C3.3.9.9%2C2%2C1.4%2C3.3%2C1.4Z%22%3E%3C/path%3E%3C/svg%3E)

### [Oil and Gas](https://assai-software.com/industries/oil-and-gas/)

![Petrochemical](data:image/svg+xml,%3Csvg xmlns=%22http://www.w3.org/2000/svg%22 xmlns:xlink=%22http://www.w3.org/1999/xlink%22 id=%22Layer_1%22 viewBox=%221.538 1.138 37.724 37.724%22 fill=%22url(%23wss-icon-fill)%22%3E%3Cdefs%3E%3ClinearGradient id=%22wss-icon-fill%22 x1=%226.7%22 y1=%2235%22 x2=%2234.1%22 y2=%225%22 gradientUnits=%22userSpaceOnUse%22%3E%3Cstop offset=%220%22 stop-color=%22%231506bf%22/%3E%3Cstop offset=%221%22 stop-color=%22%23ea6c32%22/%3E%3C/linearGradient%3E%3C/defs%3E%3Cdefs%3E%3Cstyle%3E .st0 %7B fill:url(%23wss-icon-fill)%3B %7D %3C/style%3E%3C/defs%3E%3Cpath class=%22st0%22 d=%22M6.7%2C35V7.8c0-.8.3-1.4.8-2%2C.6-.6%2C1.2-.8%2C2-.8h10.8c.8%2C0%2C1.4.3%2C2%2C.8s.8%2C1.2.8%2C2v11.9h2.4c.7%2C0%2C1.3.2%2C1.8.7.5.5.7%2C1.1.7%2C1.8v8.6c0%2C.6.2%2C1%2C.6%2C1.4.4.4.9.6%2C1.4.6s1-.2%2C1.4-.6c.4-.4.6-.8.6-1.4v-12.2c-.3.2-.6.3-.9.3s-.6.1-1%2C.1c-1.1%2C0-2.1-.4-2.8-1.2-.8-.8-1.2-1.7-1.2-2.8s.2-1.7.7-2.4c.5-.7%2C1.2-1.2%2C2-1.4l-3.8-3.8%2C1.6-1.6%2C6.3%2C6.3c.4.4.7.8.9%2C1.3.2.5.3%2C1%2C.3%2C1.6v15.8c0%2C1.2-.4%2C2.2-1.2%2C3-.8.8-1.8%2C1.2-3%2C1.2s-2.2-.4-3-1.2c-.8-.8-1.2-1.8-1.2-3v-8.9h-2.6v13.1H6.7ZM9.4%2C16.9h10.8V7.8h-10.8v9.1ZM30.1%2C16.8c.5%2C0%2C.9-.2%2C1.3-.5.3-.3.5-.8.5-1.3s-.2-.9-.5-1.3c-.3-.3-.8-.5-1.3-.5s-.9.2-1.3.5c-.3.3-.5.8-.5%2C1.3s.2.9.5%2C1.3c.3.3.8.5%2C1.3.5Z%22%3E%3C/path%3E%3C/svg%3E)

### [Petrochemical](https://assai-software.com/industries/petrochemical/)

![Power & Utilities](data:image/svg+xml,%3Csvg xmlns=%22http://www.w3.org/2000/svg%22 viewBox=%22-12.485 -15.18 825.169 825.169%22 fill=%22url(%23wss-icon-fill)%22%3E%3Cdefs%3E%3ClinearGradient id=%22wss-icon-fill%22 x1=%22102.5%22 y1=%22727.79%22 x2=%22697.7%22 y2=%2267.02%22 gradientUnits=%22userSpaceOnUse%22%3E%3Cstop offset=%220%22 stop-color=%22%231506bf%22/%3E%3Cstop offset=%221%22 stop-color=%22%23ea6c32%22/%3E%3C/linearGradient%3E%3C/defs%3E%3Cdefs%3E%3C/defs%3E%3Cpath fill=%22url(%23wss-icon-fill)%22 fill-rule=%22evenodd%22 d=%22M185.95 704.53L151.40 727.79L126.95 707.95L102.50 688.11L102.62 686.81L102.74 685.50L169.77 518.00L236.79 350.50L252.03 310.50L267.27 270.50L267.75 268.75L268.23 267.00L234.12 267.00L200.00 267.00L200.00 300.00L200.00 333.00L166.50 333.00L133.00 333.00L133.00 266.50L133.00 200.00L213.30 200.00L293.61 200.00L318.55 133.51L343.50 67.02L400.00 67.03L456.50 67.03L481.45 133.52L506.40 200.00L586.70 200.00L667.00 200.00L667.00 266.50L667.00 333.00L633.50 333.00L600.00 333.00L600.00 300.00L600.00 267.00L565.88 267.00L531.77 267.00L532.25 268.75L532.73 270.50L548.76 313.00L564.80 355.50L631.25 521.62L697.70 687.75L673.65 707.12L649.60 726.50L648.33 726.82L647.07 727.13L523.86 644.40L400.66 561.67L399.58 561.69L398.50 561.71L309.50 621.49L220.50 681.27L185.95 704.53ZM204.61 612.00L204.87 612.00L272.47 567.18L340.06 522.36L300.83 496.22L261.60 470.07L261.27 470.40L260.94 470.73L232.64 541.36L204.34 612.00L204.61 612.00ZM594.87 611.39L595.24 611.09L567.00 540.51L538.77 469.92L536.13 471.64L533.50 473.35L496.71 497.86L459.93 522.37L527.21 567.04L594.50 611.70L594.87 611.39ZM399.68 481.91L399.86 482.00L456.43 444.52L513.00 407.05L513.00 406.67L513.00 406.30L511.90 403.15L510.80 400.00L400.00 400.00L289.20 400.00L288.08 403.19L286.97 406.37L287.98 407.38L288.99 408.39L344.24 445.11L399.50 481.83L399.68 481.91ZM399.86 333.00L484.93 333.00L482.93 327.75L480.94 322.50L470.62 295.00L460.30 267.50L399.90 267.25L339.50 267.00L327.60 298.75L315.70 330.50L315.25 331.75L314.79 333.00L399.86 333.00ZM399.87 200.00L434.95 200.00L432.08 192.25L429.20 184.50L420.18 160.50L411.17 136.50L410.48 134.75L409.79 133.00L399.61 133.00L389.44 133.00L377.55 165.25L365.65 197.50L365.22 198.75L364.79 200.00L399.87 200.00Z%22%3E%3C/path%3E%3C/svg%3E)

### [Power & Utilities](https://assai-software.com/industries/utilities/)

![Renewable Energy](data:image/svg+xml,%3Csvg xmlns=%22http://www.w3.org/2000/svg%22 xmlns:xlink=%22http://www.w3.org/1999/xlink%22 id=%22Layer_1%22 viewBox=%22-3.998 -3.111 47.122 47.122%22 fill=%22url(%23wss-icon-fill)%22%3E%3Cdefs%3E%3ClinearGradient id=%22wss-icon-fill%22 x1=%221.6%22 y1=%2238.3%22 x2=%2237.525%22 y2=%222.6%22 gradientUnits=%22userSpaceOnUse%22%3E%3Cstop offset=%220%22 stop-color=%22%231506bf%22/%3E%3Cstop offset=%221%22 stop-color=%22%23ea6c32%22/%3E%3C/linearGradient%3E%3C/defs%3E%3Cdefs%3E%3Cstyle%3E .st0 %7B fill:url(%23wss-icon-fill)%3B %7D %3C/style%3E%3C/defs%3E%3Cpath class=%22st0%22 d=%22M17.5%2C38.3c0-.8.3-1.4.8-2%2C.5-.5%2C1.2-.8%2C2-.8v-10c.2%2C0%2C.4.1.7.2.2%2C0%2C.5%2C0%2C.7%2C0%2C1.2%2C0%2C2.1-.4%2C2.9-1.2s1.2-1.8%2C1.2-2.9v-.4l5.3%2C1.3c.4.1.8.3%2C1.2.6s.7.6.9%2C1l3.8%2C6.8c.4.8.6%2C1.5.5%2C2.4s-.5%2C1.6-1.1%2C2.2c-.8.8-1.6%2C1.1-2.7%2C1.1s-1.9-.4-2.7-1.1l-7.9-8v8c.8%2C0%2C1.4.3%2C2%2C.8.5.5.8%2C1.2.8%2C2h-8.3ZM5%2C34.7v-2.8h8.3v2.8H5ZM11.9%2C27.9l-7.5-2.1c-.8-.2-1.5-.7-2-1.4-.5-.7-.8-1.5-.8-2.3s.4-2%2C1.1-2.7c.7-.7%2C1.6-1.1%2C2.7-1.1h13.8c-.5.4-.9.9-1.2%2C1.4s-.4%2C1.2-.4%2C1.9.1%2C1.2.4%2C1.8.6%2C1%2C1%2C1.4l-4.4%2C2.8c-.4.2-.8.4-1.3.4s-.9%2C0-1.4-.1ZM21.7%2C24.4c-.8%2C0-1.4-.3-2-.8-.5-.5-.8-1.2-.8-2%2C0-.8.3-1.4.8-2%2C.5-.5%2C1.2-.8%2C2-.8s1.4.3%2C2%2C.8c.5.5.8%2C1.2.8%2C2s-.3%2C1.4-.8%2C2c-.5.5-1.2.8-2%2C.8ZM25.5%2C20.1c-.3-.8-.8-1.4-1.5-1.8-.7-.5-1.5-.7-2.4-.7s-.6%2C0-.9%2C0-.5.1-.8.3v-6.6c0-.5%2C0-.9.3-1.3s.4-.8.8-1.1l5.7-5.3c.6-.6%2C1.4-1%2C2.2-1s1.6%2C0%2C2.4.5c.9.6%2C1.5%2C1.3%2C1.7%2C2.4s.1%2C2-.4%2C2.9l-7.1%2C11.8ZM1.7%2C14.7v-2.8h8.3v2.8s-8.3%2C0-8.3%2C0ZM6.7%2C8.1v-2.8h10v2.8s-10%2C0-10%2C0Z%22%3E%3C/path%3E%3C/svg%3E)

### [Renewable Energy](https://assai-software.com/industries/renewable-energy/)

![Mining & Metals](data:image/svg+xml,%3Csvg xmlns=%22http://www.w3.org/2000/svg%22 xmlns:xlink=%22http://www.w3.org/1999/xlink%22 id=%22Layer_1%22 viewBox=%22-0.241 -1.741 50.482 50.482%22 fill=%22url(%23wss-icon-fill)%22%3E%3Cdefs%3E%3ClinearGradient id=%22wss-icon-fill%22 x1=%222%22 y1=%2239.5%22 x2=%2248%22 y2=%227.5%22 gradientUnits=%22userSpaceOnUse%22%3E%3Cstop offset=%220%22 stop-color=%22%231506bf%22/%3E%3Cstop offset=%221%22 stop-color=%22%23ea6c32%22/%3E%3C/linearGradient%3E%3C/defs%3E%3Cdefs%3E%3Cstyle%3E .st0 %7B fill:url(%23wss-icon-fill)%3B %7D %3C/style%3E%3C/defs%3E%3Cpath class=%22st0%22 d=%22M7.5%2C39.5c-1.5%2C0-2.8-.5-3.9-1.6-1.1-1.1-1.6-2.4-1.6-3.9v-13.5c0-.8.3-1.5.9-2.1.6-.6%2C1.3-.9%2C2.1-.9h11.5V7.5h10.4c1.5%2C0%2C2.8.5%2C3.9%2C1.6%2C1.1%2C1.1%2C1.6%2C2.4%2C1.6%2C3.9v9h3v-3c0-.4%2C0-.8.2-1.1.2-.4.4-.7.6-1l3.5-3.6%2C8.3%2C15.7h-9.7c-.8%2C0-1.5-.3-2.1-.9-.6-.6-.9-1.3-.9-2.1v-1h-3v4.8c.6.5%2C1.1%2C1.2%2C1.5%2C1.9.4.7.5%2C1.5.5%2C2.3%2C0%2C1.5-.5%2C2.8-1.6%2C3.9-1.1%2C1.1-2.4%2C1.6-3.9%2C1.6s-2.3-.4-3.3-1.1-1.6-1.7-2-2.9h-10.9c-.4%2C1.2-1%2C2.1-2%2C2.9s-2%2C1.1-3.3%2C1.1ZM7.5%2C36.5c.7%2C0%2C1.3-.2%2C1.8-.7.5-.5.7-1.1.7-1.8s-.2-1.3-.7-1.8c-.5-.5-1.1-.7-1.8-.7s-1.3.2-1.8.7c-.5.5-.7%2C1.1-.7%2C1.8s.2%2C1.3.7%2C1.8%2C1.1.7%2C1.8.7ZM28.8%2C36.5c.7%2C0%2C1.3-.2%2C1.8-.7.5-.5.7-1.1.7-1.8s-.2-1.3-.7-1.8c-.5-.5-1.1-.7-1.8-.7s-1.3.2-1.8.7c-.5.5-.7%2C1.1-.7%2C1.8s.2%2C1.3.7%2C1.8c.5.5%2C1.1.7%2C1.8.7ZM43.1%2C26l-4.2-7.7c-.2.1-.3.2-.4.4s-.1.4-.1.6v6.8h4.7ZM19.5%2C22h9.9v-9c0-.7-.2-1.3-.7-1.8-.5-.5-1.1-.7-1.8-.7h-7.4v11.5Z%22%3E%3C/path%3E%3C/svg%3E)

### [Mining & Metals](https://assai-software.com/industries/mining/)

![Construction and Infrastructure](data:image/svg+xml,%3Csvg xmlns=%22http://www.w3.org/2000/svg%22 xmlns:xlink=%22http://www.w3.org/1999/xlink%22 id=%22Layer_1%22 viewBox=%22-0.625 -0.175 48.35 48.35%22 fill=%22url(%23wss-icon-fill)%22%3E%3Cdefs%3E%3ClinearGradient id=%22wss-icon-fill%22 x1=%224.9%22 y1=%2242.1%22 x2=%2242.2%22 y2=%225.9%22 gradientUnits=%22userSpaceOnUse%22%3E%3Cstop offset=%220%22 stop-color=%22%231506bf%22/%3E%3Cstop offset=%221%22 stop-color=%22%23ea6c32%22/%3E%3C/linearGradient%3E%3C/defs%3E%3Cdefs%3E%3Cstyle%3E .st0 %7B fill:url(%23wss-icon-fill)%3B %7D %3C/style%3E%3C/defs%3E%3Cpath class=%22st0%22 d=%22M38.4%2C42l-12.6-12.6%2C2.9-2.9%2C12.6%2C12.6-2.9%2C2.9ZM9.4%2C42l-2.9-2.9%2C14.5-14.5-5.4-5.4-1.2%2C1.2-2.2-2.2v4.3l-1.2%2C1.2-6.1-6.1%2C1.2-1.2h4.3l-2.4-2.4%2C6.6-6.6c.6-.6%2C1.2-1%2C1.9-1.2s1.4-.3%2C2.2-.3%2C1.5.1%2C2.2.4%2C1.3.7%2C1.9%2C1.3l-5.4%2C5.4%2C2.4%2C2.4-1.2%2C1.2%2C5.2%2C5.2%2C6.1-6.1c-.3-.4-.5-.9-.6-1.5s-.2-1.2-.2-1.8c0-1.8.6-3.3%2C1.9-4.6s2.8-1.9%2C4.6-1.9.9%2C0%2C1.3.2.6.2.9.4l-4.3%2C4.3%2C3.8%2C3.8%2C4.3-4.3c.2.3.3.6.4%2C1s.2.8.2%2C1.3c0%2C1.8-.6%2C3.3-1.9%2C4.6s-2.8%2C1.9-4.6%2C1.9-1.1%2C0-1.6-.1-.8-.2-1.2-.4l-23.5%2C23.5Z%22%3E%3C/path%3E%3C/svg%3E)

### [Construction and Infrastructure](https://assai-software.com/industries/construction/)

## FAQ

### What does Assai Enterprise do?

Assai Enterprise ensures that engineering information is consistent, complete, and verified across systems by coordinating updates and confirming that all required changes have been implemented.

### Does Assai Enterprise replace existing systems?

No. Assai Enterprise works across your existing systems, ensuring they stay aligned without requiring replacement or data migration.

### How is this different from EAM or CMMS systems?

EAM and CMMS systems manage assets and maintenance activities. Assai Enterprise ensures that engineering information remains consistent and complete across all systems those assets depend on.

### How is this different from our existing EAM or CMMS?

EAM and CMMS systems manage assets and maintenance. Assai ensures that engineering changes are fully implemented and consistent across all systems those assets depend on.

### How does Assai Enterprise improve data quality?

It identifies gaps, tracks required updates, and verifies completion across systems, ensuring that data is consistent and reliable.

### Can Assai Enterprise support digital initiatives and AI?

Yes. By ensuring engineering information is consistent and complete across systems, it provides a reliable foundation for digital initiatives and AI.

## See Assai Enterprise in Action

Explore how your team can coordinate smarter, reduce complexity, and stay audit-ready—all from one platform.

[Request a 20-Minute Walkthrough](https://assai-software.com/book-demo-assai/) [Download overview](https://assai.activehosted.com/content/7Dk4A/2025/11/24/5e32b9cc-701d-4c5c-ab39-eb378c6063d0.pdf)
