  • Pre-Commissioning: getting ready for operations

    Pre-Commissioning: getting ready for operations

    This article is part of a series about the typical stages and phases of complex engineering projects. Each article takes one stage and describes how Assai supports the requirements and common challenges of that stage – ultimately contributing to the efficient, timely, (cost-)effective and safe delivery of projects.

    Download all articles on complex engineering stages in a 50+ page PDFA flowchart with stages: Feasibility Study, Conceptual Design, Pre-FEED, FEED, Detailed Design, Procurement & Fabrication, Construction & Installation, Pre-Comm., and Handover.

     

    The Pre-Commissioning phase is the 8th stage in complex engineering projects.
     

    (Pre-)Commissioning in a nutshell 

    The pre-commissioning (or pre-comm) stage of engineering projects is a critical phase that occurs after construction & installation and before the facility/asset is put into operation. It involves both the contractor and the operator. 

    Pre-commissioning aims to ensure that the facility is ready for safe and efficient operation and to identify and resolve any issues that may have arisen during construction. It involves a series of activities that aim to ensure that all systems and components of the facility are properly installed, tested, and prepared for the Operations phase (see next section). 

    After pre-commissioning follows commissioning, the main difference is that during pre-commissioning, dry runs and trial runs with test fluids (e.g. water) may occur. Still, during commissioning, actual process fluids are introduced to process equipment. So both may involve testing control systems, starting up equipment, and conducting trial runs. After all required pre-commissioning and commissioning checks have been passed successfully, start-up (SU) can take place with a handover from the engineering project to Operations. 

     

    What happens during Pre-Commissioning? 

    Firstly, Mechanical Completion (MC) verification is an important interface between construction and pre-commissioning. This can stand on its own or be part of pre-commissioning. MC verification confirms that the construction and installation of all components (e.g. equipment, piping, cabling, electrical and mechanical components, instrumentation) are physically complete, inspected, tested, and have all required documentation. This results in a Mechanical Completion Certificate (MCS). 

    Other typical activities during pre-commissioning include: 

       

        • Flushing and cleaning of systems: the piping and process systems need to be cleared of any debris or contaminants that may have been introduced during construction. 
        • Leak testing: all piping and equipment are tested to ensure there are no leaks or other issues that could cause problems during operations. 
        • Testing of safety systems: safety systems, such as fire protection and emergency shutdown systems, are tested to ensure they function properly. 
        • Testing of control systems: control systems, such as SCADA (Supervisory Control and Data Acquisition) systems, DCS (Distributed Control Systems), and PLC (Programmable Logic Controller), are tested to ensure they are properly configured and able to control and monitor the various systems and equipment in the facility. 
        • Commissioning of utilities: utilities, such as electricity, water, and gas, are commissioned to ensure that they are available and functioning properly. 
        • Training of personnel: training people on the operation and maintenance of the facility. 
       
      Pre-commissioning checks if all components are properly installed and tested

       

      Pre-commissioning checks if all components are properly installed and tested
       

      (Pre-)commissioning checks & checklists 

      As mentioned, (pre-)commissioning involves many checks on many different components. Organizing checkpoints into checklists helps engineers or other specialists efficiently, correctly, safely, and timely completion of all required checks. If there are follow-up actions or open ends, punch lists may be needed to keep track of any remaining items to close a checkpoint. 

      All the activities mentioned earlier can be supported by (pre-)commissioning checklists. Individual systems or equipment (types) may also have their own (detailed) checklists to check if they are functioning properly. 

      Some example checkpoints to illustrate: 

         

          • Visually check equipment for defects. 
          • Ensure correct equipment assembly based on the vendor P&ID drawing. 
          • Equipment grounding is properly installed. 
          • Access ladders are properly fitted and fastened. 
          • Remove all temporary construction materials. 
          • Operating blinds are installed as in the drawing. 
          • Platforms allow safe access to valves and instrumentation on the skid. 
          • Pressure Safety Valves (PSV) inlet and outlet open; by-pass valves closed. 
          • Check all drain and vent valves. 
        Checklists are important in the pre-commissioning phase.

         

        Checklists are important in the pre-commissioning phase.
         

        How Assai supports Pre-Commissioning

        Assai provides out-of-the-box functionality for all project stages (and operations), based on more than 30 years of experience. Key Assai features supporting Pre-Commissioning and Commissioning include: 

           

            • Easy access to the latest project documentation for all stakeholders 
            • Checklist module: flexible, unlimited checks, grouped as checklists and automatically assigned to systems or equipment 
            • Distinguish between mandatory and optional checks 
            • Complete checklists on-site on a tablet, with Assai Mobile 
            • Create (upload) and complete punch lists online 
            • Restrict commissioning stage changes for components if mandatory checks are pending 
            • Technical query module to process any type of request, deviation, or issue, also on-site with Assai Mobile 
            • Find documentation and technical queries by system, unit, tag, or equipment 
            • Dedicated reports on (pre-)commissioning progress. See bottlenecks before they become a problem or cause delays. 
            • Advanced reporting capabilities with Power BI (and integrated reports) 
            • Comprehensive REST API library to interface with other applications 

          Plus, as seen in previous articles:

             

              • Assai Cloud (or on-premises) is a flexible, turnkey solution with out-of-the-box support for engineering projects from start to end, plus operations, maintenance & modifications, and Digital Twin environments.
             

            Summary

            We hope you found this article about the Pre-Commissioning stage interesting and useful. Please let us know if you have any questions or feedback, or if you would like to explore how Assai could support your project(s). 

            Book a demo

            A short summary of what was discussed in this article: 

               

                • Pre-commissioning and commissioning occur after construction and installation, and before the facility or asset is put into operation. 
                • (Pre-)commissioning involves various activities to ensure all systems and components of the facility are properly installed, tested, and ready for operation. This can require checklists and punch lists. 
                • Assai offers special checklist functionality and much more to support the efficient, timely, and safe completion of (pre-)commissioning. 
               

              Download the 50+ page PDF!

              Previous stage: Construction & Installation

              Next stage: Handover

              All articles in this series:

              Feasibility Study
              Conceptual Design
              Pre-FEED
              FEED
              Detailed Design
              Procurement & Fabrication
              Construction & Installation
              Pre-Commissioning (current article)
              Handover

              Want to explore more about Document Management and Document Control? Download our latest whitepaper and guide via the buttons below!

              Whitepaper: What to consider when purchasing a DMS
              The definitive guide to document control and document management

            • 6 criteria for a Document Management System (DMS) selection

              6 criteria for a Document Management System (DMS) selection

              Are you considering implementing a document management system (DMS) for your organization? A document management system (DMS) is a software platform that helps businesses manage, organize, and store electronic documents. Not only can it streamline processes and improve collaboration, but it can also increase productivity and efficiency. However, choosing the wrong system can lead to frustration, wasted time and resources, and even security breaches. That’s why it’s important to carefully evaluate your options and consider a range of DMS selection criteria, such as user-friendliness, scalability, security, integration, customization, support, and cost. This blog post will delve into these key criteria to help you select the best document management system for your organization.

              1. Security

              Security is one of the most important factors to consider when selecting a Document Management System. Your DMS will likely contain sensitive information, such as confidential documents, client data, or financial records. Choosing a system that offers robust security measures to protect this information from unauthorized access, breaches, or data loss is crucial.

              When evaluating the security of a DMS, you should consider the following factors:

              1. Secure storage: Look for a system that offers secure storage options, such as data encryption, to protect your documents from unauthorized access or tampering.
              2. Access controls: Consider a system that offers access controls, such as role-based permissions or multi-factor authentication, to ensure that only authorized users can access specific documents or information.
              3. Encryption: Choose a system that uses encryption to protect your data as it is transmitted over the internet or stored on servers.
              4. Backup and recovery: Evaluate the system’s backup and recovery capabilities to ensure that your data is protected in case of an unexpected event, such as a natural disaster or cyber attack.

              By choosing a DMS with solid security measures, you can protect your sensitive information and minimize the risk of data breaches or losses.

              2. Scalability

              Scalability is a crucial Document Management System selection criterion. Choosing a DMS that can grow with you as your business grows and evolves is essential. This means looking for a system that can accommodate an increasing volume of documents and users and the size of your organization.

              There are several benefits to choosing a scalable DMS. First and foremost, it can help ensure that you don’t outgrow your system and have to switch to a new one down the line. This can save time, resources, and money and minimize disruption to your business operations. A scalable DMS can help you accommodate new employees, clients, or projects and support your organization as it expands.

              When evaluating the scalability of a DMS, you should consider the following factors:

              1. Number of users: How many users can the system support? Will you be able to add more users as your organization grows?
              2. Volume of documents: Can the system handle an increasing volume of documents, such as new contracts, invoices, or reports?
              3. Size of the organization: Is the system suitable for small, medium, or large organizations? Can it accommodate your organization’s specific needs, such as multiple departments or locations?
              4. Customization options: Does the system offer customization options, such as the ability to create custom fields or workflow processes to meet your organization’s specific needs?

              By considering these factors, you can choose a DMS that can scale with your organization and support your business as it grows and evolves.

              3. Integration

              Integration is important in the Document Management System selection process. First, it can help you avoid the need for multiple disparate systems, which can be confusing and time-consuming to manage. Instead, you can manage all your documents from one central location, improving efficiency and productivity.

              Second, integration can help you streamline processes and avoid duplication of effort.

              When evaluating the integration capabilities of a DMS, you should consider the following factors:

              1. Compatibility with existing systems: Can the DMS integrate with the systems and software that your business already uses, such as your CRM, HRIS, or project management software?
              2. Customization options: Does the DMS offer customization options, such as the ability to create custom fields or workflow processes to meet your organization’s specific needs?
              3. Support: Does the vendor offer support and resources to help you integrate the DMS with your existing systems?

              You can improve efficiency and streamline processes by choosing a DMS that integrates seamlessly with your other systems and software.

              4. User-friendliness

              A DMS should be easy to use and intuitive for all team members. A user-friendly interface and clear instructions can help users learn how to use the system quickly and find what they need without difficulty. This can save time and improve productivity.

              When evaluating the user-friendliness in Document Management System selection process, you should consider the following factors:

              1. Interface: Is the interface clean and easy to navigate? Does it have a logical layout and clear labels?
              2. Instructions: Are there clear instructions for how to use the system, such as a user guide or tutorial?
              3. Support: Does the vendor offer support resources, such as training materials or online community support, to help users learn how to use the system?

              5. Support and maintenance

              As with any technology, there will be times when you need support and maintenance for your DMS. It’s important to choose a system that offers comprehensive support and maintenance services, including regular updates and the ability to easily troubleshoot any issues that may arise.

              When evaluating the support and maintenance options for a DMS, you should consider the following factors:

              1. Support: Does the vendor offer technical support, training resources, and online community support to help you get the most out of your system?
              2. Maintenance: Does the vendor offer regular updates and maintenance services to keep your system running smoothly and address any issues that may arise?
              3. Customization: Does the system offer customization options, such as the ability to create custom fields or workflow processes to meet your organization’s specific needs?

              6. Cost

              Cost is always a factor to consider for Document Management System selection. It’s essential to determine your budget and look for a system that offers the features and functionality you need at a price that is within your means.

              When evaluating the cost of a DMS, you should consider the following factors:

              1. Upfront costs: What are the initial costs to purchase or set up the system, such as hardware and software requirements or installation fees?
              2. Subscription fees: Many DMSs are subscription-based, which means you’ll need to pay a monthly or annual fee to access the system. These fees can vary widely, so it’s important to consider the cost of subscriptions for different systems carefully.
              3. Additional features: Some DMSs offer additional features or functionality that may come at an additional cost. For example, you may need to pay extra for advanced workflow capabilities, document annotation tools, or integration with other systems.
              4. Maintenance and support: Some vendors may charge fees for maintenance, support, or updates to the system. It’s important to understand what these costs are and whether they are included in the subscription.
            • Construction & Installation: putting it all together

              Construction & Installation: putting it all together

              This article is part of a series about the typical stages and phases of complex engineering projects. Each article takes one stage and describes how Assai supports the requirements and common challenges of that stage – ultimately contributing to the efficient, timely, (cost-)effective and safe delivery of projects. 

              Download all articles on complex engineering stages in a 50+ page PDFA series of connected circles showing project phases: Feasibility Study, Conceptual Design, Pre-FEED, FEED, Detailed Design, Procurement & Fabrication, Construction & Installation, Pre-Comm., and Handover.

               

              The Construction & Installation phase is the 7th stage in complex engineering projects.
               

              Construction & Installation in a nutshell

              The Construction & Installation stage follows after Procurement & Fabrication. Construction and installation involve putting all the various components and materials that have been procured and fabricated together on-site to create the finished project/asset – based on the final approved documents and drawings. This typically includes activities such as assembling structures, installing mechanical and electrical systems, and testing the completed project to ensure that it meets the required specifications.

              In practice, it may not always be possible to construct and install everything exactly as designed, which is why this stage is concluded with the “as-building” process to align all drawings with the reality where deviations were required (see below).

              Construction and installation are the final steps in the engineering project process, and they are typically overseen by a construction manager or project manager. Completion of this stage is often referred to as “mechanical completion”. This is traditionally the end of the EPC contract scope, but depending on the contract model, the responsibility of the EPC contractor may extend further, e.g. to also cover pre-commissioning and commissioning.

               

              As-building

              For various reasons, engineering designs on paper cannot always be constructed and installed exactly as designed. For instance, due to physical limitations or later design variations, pipelines or cables may have been routed or connected differently than shown in the latest “approved for construction” (AFC) drawing.

              To enable safe and efficient operations, it is important that all drawings in the eDMS are matching with the real situation on-site. This requires engineers to do site walks, highlighting differences between the design drawings and how things have been constructed in reality. This is typically done by marking up drawings (redlining, red-blue markups), either physically or digitally, which then need to be updated by a designer using CAD tools or other software.

              After checking a drawing and incorporating any markups into a new revision, its status in the eDMS can be updated to reflect this: As-built (AB or ASB). Standards for revision codes and statuses can vary per project and organization.

              Construction and installation based on detailed design drawings.

               

              Construction and installation based on detailed design drawings.
               

              Project risks during Construction & Installation

              There are several risks that can arise during the construction & installation phase of engineering projects, and need to be addressed, including:

                 

                  • Cost overruns: The cost of materials, labour, or other expenses can exceed the original estimates, resulting in higher costs than expected.
                  • Schedule delays: The project may take longer than expected to complete, leading to delays and potential loss of revenue.
                  • Quality issues: Poor workmanship or defective materials can lead to subpar quality, which can affect the safety, performance, and durability of the project.
                  • Health and safety risks: Construction sites can be dangerous environments, and workers and the public may be at risk of accidents or injuries.
                  • Environmental impacts: Construction and installation activities can have negative impacts on the environment, such as air and water pollution or destruction of natural habitats.
                  • Changes in project scope: The scope of the project may change during construction and installation, leading to additional costs or delays.
                  • Legal issues: Disputes or claims related to contracts, permits, or other legal issues can arise during construction and installation, potentially leading to costly delays or legal liabilities.
                Construction and installation based on approved designs and specifications.

                 

                Construction and installation based on approved designs and specifications.
                 

                How Assai supports Construction & Installation

                Assai is a comprehensive, user-friendly, centralized (cloud) platform for accessing and controlling unlimited amounts of project documentation. It offers advanced (automated) distribution features, access control, detailed audit trails, and supports a fully digital, paperless working environment. Assai streamlines and improves collaboration and communication, and helps to mitigate the many risks associated with construction & installation.

                Assai provides out-of-the-box functionality for each project stage (and operations), based on more than 30 years of experience. Key Assai features supporting Construction & Installation include:

                   

                    • Easy access for all stakeholders to required project documentation
                    • Excellent version control with latest revisions always on top
                    • Digital Construction Work Packages (CWP)
                    • Easy online exchange of documents and drawings with contractors (Assai Portal)
                    • Track official distribution and stakeholder actions with transmittals
                    • As-building made simple with integrated redline markup (RLMU) file upload and digital redlining on tablets (Assai Mobile)
                    • Empower authorized engineers or designers to check out and revise/update drawings
                    • Grant access to source / native files only for those who need this
                    • Technical Query module to handle any kind of request or deviation
                    • Live progress and bottlenecks with Assai’s advanced planning & reporting features

                  Plus, as seen in previous articles:

                     

                      • Assai Cloud (or on-premises) is a flexible, turnkey solution with out-of-the-box support for engineering projects from start to end, plus operations, maintenance & modifications, and Digital Twin environments.
                     

                    Summary

                    We hope you found this article about the Construction & Installation stage interesting and useful. Please let us know if you have any questions or feedback, or if you would like to explore with us how Assai could support your project(s).

                    Book a demo

                    A short summary of what was discussed in this article:

                       

                        • The construction and installation stage follows after procurement & fabrication.
                        • Construction and installation involve assembling and installing all the components and materials to create the finished project or asset.
                        • Construction & installation knows many risks; for instance: cost overruns, schedule delays, scope changes, HSE risks and legal issues.
                        • A robust eDMS system specialized in engineering & construction helps to mitigate these risks. It forms an invaluable asset for the successful execution of the construction and installation phase – efficiently, safely, on time and within budget.
                        • Many industry leaders worldwide trust Assai as their eDMS solution of choice, which is based on 30+ years of industry experience and best practices. Assai promises (and delivers) true out-of-the-box support for all project stages including Construction & Installation, as well as for operations, maintenance & modifications, and Digital Twins.
                       

                      Download the 50+ page PDF!

                       

                      Previous stage: Procurement & Fabrication

                      Next stage: Pre-Commisioning

                      All articles in this series:

                      Feasibility Study
                      Conceptual Design
                      Pre-FEED
                      FEED
                      Detailed Design
                      Procurement & Fabrication
                      Construction & Installation (current article)
                      Pre-Commissioning
                      Handover

                      Want to explore more about Document Management and Document Control? Download our latest whitepaper and guide via the buttons below!

                      Whitepaper: What to consider when purchasing a DMSThe definitive guide to document control and document management

                    • Best practices for document control

                      Best practices for document control

                      Document control is essential to any business or organization involved in complex projects and operations. Proper document control ensures that important information is accurate, organized, and easily accessible. It also helps to prevent errors, inconsistencies, and misunderstandings.

                      In this blog post, we will discuss some of the best practices for document control and how they can help improve the efficiency and effectiveness of your organization.

                      1. Create and communicate a clear document control policy

                      Organizations must implement a policy that outlines the rules, procedures, and responsibilities for managing documents. This ensures precise and comprehensive document control. The policy should specify document types that require control, storage, and accessibility and who is responsible for maintaining them.

                      2. Establish a consistent naming and numbering system

                      We highly recommend establishing a consistent naming and numbering system. This standardization ensures clear and organized communication and record-keeping. It helps prevent confusion and makes it easier to locate and reference specific items. Moreover, this ensures that documents can be easily identified, located, and accessed. It will also prevent confusion and duplication and make tracking changes and updates to your documents easier.

                      3. Invest in a good document control system

                      Another important aspect of document control is ensuring that your documents are organized and easily accessible. This can be achieved through a document management and control system, a specialized software tool that helps to organize and manage your documents. A robust system allows you to categorize, search, and retrieve documents quickly and easily. It should also provide features such as version control, revision history, and access control to help ensure that your documents are accurate, up-to-date, and secure.

                      4. Clearly assign the responsibilities

                      Having clearly assigned responsibilities within the document review and approval process helps to ensure accountability and prevent confusion or misunderstandings. By clearly outlining who is responsible for reviewing and approving each document, team members know exactly what they should focus on. They can complete their tasks in a timely and efficient manner. This also helps to avoid duplication of effort and ensures that all relevant stakeholders are involved in the decision-making process. In addition, having a system in place for tracking and documenting changes and updates allows for easy reference and historical record-keeping. This can be especially useful for regulatory compliance and audits. Overall, having a clear and well-defined document review and approval process can improve the effectiveness and efficiency of the team.

                      5. Scrub your document database sometimes

                      Lastly, we recommend you regularly review and update documents for their accuracy and relevance. The practice can involve conducting periodic audits to identify outdated documents and updating or retiring them as needed. In addition, it’s important to keep documents in a secure location and limit access to authorized individuals. However, managing the large volume of documents generated by organizations can be challenging, so implementing a system for archiving and retiring old or unused documents makes this task easier.

                      Summary

                      Document control is essential to any business or organization involved in complex projects and operations. By implementing best practices such as having a clear and comprehensive document control policy, establishing a consistent naming and numbering system, and regularly reviewing and updating your documents, you can improve the efficiency and effectiveness of your organization. Doing so will also help prevent errors, inconsistencies, and misunderstandings and ensure that your essential information is accurate, organized, and easily accessible.

                      Assai’s document control system

                      At Assai, we take pride in offering the best document control and document management system for complex projects and operations in the market. Document control is one of our core functionalities that provides essential features, such as Dashboard & Reporting, Revision control, Transmittal management, and automated email reminders. Assai enables document controllers to control document flows and timely interactions and proactively supports the best practices for document management among all stakeholders, saving time for document controllers in their day-to-day job.

                      We offer a system that meets different industries’ needs, including Oil & Gas, Renewable Energy, Construction & Engineering, Transportation, Mining, and Utilities. Our user-friendly, secure, and scalable solutions come with expert support and training. Check it out on our site, and feel free to book a demo!

                      Book a demo
                      Get in touch

                      Want to know more? Download our latest material via the buttons below!

                    • Procurement & Fabrication: from theory to reality

                      Procurement & Fabrication: from theory to reality

                      This article is part of a series about the typical stages and phases of complex engineering projects. Each article takes one stage and describes how Assai supports the requirements and common challenges of that stage – ultimately contributing to the efficient, timely, (cost-)effective and safe delivery of projects.

                      Download all articles on complex engineering stages in a 50+ page PDFA project timeline with overlapping circles: Feasibility Study, Conceptual Design, Pre-FEED, FEED, Detailed Design, Procurement & Fabrication, Construction & Installation, Pre-Comm., and Handover.

                       

                      The Procurement & Fabrication phase is the 6th in complex engineering projects.
                       

                      Procurement & Fabrication in a nutshell

                      After successful completion of the Detailed Design stage, procurement and fabrication come next. This happens based on the final, approved design documents and “Approved for Construction (AFC)” drawings.

                      Procurement involves the acquisition of materials, equipment, and services needed for construction. This may include activities such as identifying vendors, requesting bids or proposals (bidding & tendering), and negotiating contracts. Sometimes preferred suppliers have been listed upfront.

                      Fabrication, on the other hand, involves the actual manufacturing or assembly of materials and components into finished products, which can be put together on-site. This can involve cutting and shaping materials, welding and assembling parts, and testing the finished product to ensure that it meets the required specifications. Together, procurement and fabrication are crucial steps in the successful completion of any engineering project.

                      Fabrication of components required for construction

                       

                      Fabrication of components required for construction
                       

                      Who is involved in Procurement & Fabrication?

                      Procurement and fabrication are usually carried out by different teams or departments. The procurement team is responsible for acquiring the materials and services needed for the project, while the fabrication team is responsible for ensuring that the materials are manufactured or assembled according to the project specifications.

                      In some cases, the same company or organization may be responsible for both procurement and fabrication. For example, a construction company may have its own procurement team that acquires materials from suppliers, and a fabrication team that assembles those materials into finished products. In other cases, the procurement and fabrication processes may be carried out by separate companies. For example, a construction company may hire a subcontractor to fabricate certain components of a project.

                      Overall, the key players involved in procurement and fabrication include the project owner or client (providing the overall direction and funding for the project), the engineering design team, procurement teams, fabrication teams, and vendors or suppliers of materials and services. Also involved may be consultants who provide advice and expertise on procurement and fabrication, and regulators or government agencies responsible for overseeing the procurement process.

                       

                      Typical challenges for Procurement & Fabrication

                      Challenges for procurement include identifying and sourcing the right materials and equipment for the project, negotiating contracts with suppliers, and ensuring that all materials and equipment are delivered on time and within budget. Another challenge can be coordinating the work of different vendors or contractors, as well as managing any changes to the project scope that may affect the procurement of materials and equipment. Furthermore, there can be challenges related to document control, such as ensuring that all project documentation is accurate, up-to-date and easily accessible to all stakeholders.

                      Challenges for fabrication include coordinating the fabrication of many different components, ensuring that all work is completed on time and within budget, and managing changes to the project scope that may affect the fabrication process. The same document control challenges as for procurement apply here as well. Other potential challenges include managing the work of different contractors or vendors, and ensuring that all work is done in accordance with relevant safety and quality standards. Furthermore, there may be challenges related to the logistics of transporting and assembling fabricated components on site.

                      A digitally blended image showing an industrial plant with pipes and machinery, merging with technical engineering blueprints and diagrams on the left side.

                       

                      Design drawings and 3D models are becoming reality
                       

                      How Assai supports Procurement & Fabrication

                      The cutting-edge document control system Assai helps to ensure that all project documentation is accurate, up-to-date, and easily accessible to all team members and stakeholders. This is particularly important for procurement to source and purchase the right materials and equipment, or to provide fabrication with the right drawings and instructions. Assai also streamlines communication and collaboration among team members, and provides a centralized location for storing and organizing all project documentation. This reduces the risk of errors and delays for the project.

                      Key Assai features that support Procurement & Fabrication:

                         

                          • Central repository for all relevant documents and drawings
                          • Organize documents in packages and (custom) folder trees
                          • Vendor document control module (SDRL / VDRL tracking)
                          • Assai breakdown structure to quickly find documentation by tag or equipment
                          • Assai Portal to exchange documents and drawings with vendors and contractors
                          • Technical Queries module to process any kinds of requests or deviations
                          • Correspondence module to manage official letters and communications
                          • Power BI reporting integration

                        Plus, as seen in previous articles:

                           

                            • Assai Cloud (or on-premises) is a flexible, turnkey solution with out-of-the-box support for engineering projects from start to end, plus operations, maintenance & modifications, and Digital Twin environments.
                           

                          Summary

                          We hope you found this article about the Procurement & Fabrication stage interesting and useful. Please let us know if you have any questions or feedback, or if you would like to explore with us how Assai could support your project(s).

                          Book a demo

                          A short summary of what was discussed in this article:

                             

                              • Procurement involves acquiring materials and equipment for construction, while fabrication involves manufacturing and assembling materials into finished products.
                              • Many industry leaders worldwide trust Assai as their eDMS solution of choice, which is based on 30+ years of industry experience and best practices. Assai promises (and delivers) true out-of-the-box support for all project stages including Procurement & Fabrication, as well as for operations, maintenance & modifications, and Digital Twins.
                             

                            Download the 50+ page PDF!

                             

                            Previous stage: Detailed Design

                            Next stage: Construction & Installation

                            All articles in this series:

                            Feasibility Study
                            Conceptual Design
                            Pre-FEED
                            FEED
                            Detailed Design
                            Procurement & Fabrication (current article)
                            Construction & Installation
                            Pre-commissioning
                            Handover

                            Want to explore more about Document Management and Document Control? Download our latest whitepaper and guide via the buttons below!

                            Whitepaper: What to consider when purchasing a DMSThe definitive guide to document control and document management

                          • Benefits of a document control system for document controllers

                            Benefits of a document control system for document controllers

                            A document control system is an essential tool for document controllers, as it can help to save time and streamline their workflow. This blog post explores the key ways the system can help document controllers save time and improve efficiency.

                            What are the benefits of document control?

                            1. An easy way for document organization

                            Firstly, the most important benefit, a document control system allows document controllers to manage and organize their documents easily. With a document control system, document controllers can create a central repository for all of their documents. The document can be accessed and shared with others as needed. Hence, it eliminates the need for document controllers to search through physical files or emails to find the documents they need. Consequently, it can save a significant amount of time and effort.

                            2. Consistency and standardization

                            Secondly, the system provides a consistent and standardized approach to document control. With a document control system, document controllers can establish clear guidelines and procedures for document workflows and document numbering. This ensures that all documents are consistent. In addition, it enhances quality, saves time, and reduces the need for revisions and rework.

                            3. A great tool that helps identify bottlenecks and delays

                            A DC system helps document controllers track their documents’ progress and identify potential bottlenecks or delays. With a document control system, document controllers can view the status of each document, as well as any associated tasks and deadlines. By identifying potential issues, they can take action to resolve them. This saves time and prevents delays.

                            4. A document control system saves time for document controllers

                            A document control system can save time for document controllers by automating many tasks. These include organizing and storing documents, tracking changes and revisions, and disseminating documents to appropriate stakeholders. This can help document controllers manage large numbers of documents more efficiently and ensure that the most up-to-date versions of documents are readily available.

                            Additionally, a document control system can provide a central location for storing and accessing documents, saving time that would otherwise be spent searching for and retrieving documents.

                            5. Better compliance with regulations and standards

                            A document control system can help document controllers more easily comply with relevant regulations and standards by providing tools for tracking and managing documents in accordance with these requirements.

                            Assai’s document control system

                            At Assai, document control is one of our core functionality that provides essential features, such as Dashboard & Reporting, Revision control, Transmittal management, and automated email reminders. Assai enables document controllers to control document flows and timely interactions among all stakeholders proactively, saving time for document controllers in their day-to-day job.

                            We offer a system that meets different industries’ needs, including Oil & Gas, Renewable Energy, Construction & Engineering, Transportation, Mining, and Utilities. Our user-friendly, secure, and scalable solutions come with expert support and training. Check it out on our site, and feel free to book a demo!

                            Book a demo
                            Get in touch

                            Want to know more? Download our latest material via the buttons below!

                          • How redlining helps engineers on offshore assets

                            How redlining helps engineers on offshore assets

                            As an offshore engineer, you know that the work is complex and ever-changing. From designing and building offshore structures to maintaining and repairing existing ones, countless challenges exist. One of the most important tools is redlining. In this blog post, we will share the benefits of redlining. Understanding the power of redlining is essential for success. So, before we begin, let’s take a moment to review what redlining is and why it’s such a valuable tool for engineers working in the offshore industry.

                            What is redlining?

                            Redlining is a common term used in engineering and design work. It refers to adding comments or notes to a technical drawing using a red colored pen or pencil. The purpose of redlining is to highlight changes that need to be made to the drawing. Moreover, it helps point out potential problems or issues.

                            Benefits of redlining for offshore engineers

                            Redlining can be an essential tool for engineers in offshore assets requiring high collaboration. Firstly, it allows them to quickly and easily collaborate, comment, and review the design and construction of these complex systems. So, engineers use comments and suggestions to improve the technical documentation. This ensures that the final version of the offshore asset reflects the intended design and meets safety and performance requirements.

                            Next, an engineer can quickly and easily share their ideas with the rest of the team and see the changes and comments made by others in real-time. Hence, the design process is efficient and effective and helps identify and resolve potential problems or issues before they become significant challenges. 

                            Redlining can also help organize and prioritize comments and suggestions, allowing engineers to categorize their remarks according to different criteria, such as safety, efficiency, or cost. It ensures that the offshore asset is of the highest possible quality, and lastly, redlining can help prevent costly mistakes or errors during construction. For example, engineers reviewing a blueprint for an offshore platform can use redlining to draw attention to any potential safety hazards or design flaws. It allows the engineer to quickly and easily communicate their concerns to other team members without writing lengthy explanations or comments.

                            Assai’s solution for redlining

                            At Assai, our advanced functionality builds upon the core functionality to tailor our solution to your needs. Assai’s document management and control system enable users to integrate with a redlining tool seamlessly without many document versions in many places, keeping all the revisions centralized. Assai users can sort documents and assets by revision and easily assign them to the right stakeholders. Redline markup (RLMU) files are easy to upload to Assai or create directly in Assai Mobile. Drawings are clearly flagged when redlining files are available.

                            Our document control and document management system helps offshore energy projects and operations, in the oil and gas industry as well as the renewable energy industry. Check it out on our site, and feel free to book a demo!

                            Book a demo Get in touch

                            Want to explore more about Document Management and Document Control? Download our latest whitepaper and guide via the buttons below!

                            Whitepaper: What to consider when purchasing a DMS
                            The definitive guide to document control and document management

                          • Document Control for the Renewable Energy industry

                            Document Control for the Renewable Energy industry

                            Document control is essential to any successful business, including the renewable energy industry. With a focus on sustainability and regulatory compliance, companies in this industry need robust systems to manage and control their documents. In this blog post, we will discuss the role of document control in the renewable energy industry, the benefits of implementing an effective system, and the critical components of such a system.

                            What is document control?

                            First, let’s define document control and its importance in the renewable energy industry. Simply put, document control is the process of managing and controlling the creation, revision, approval, distribution, and storage of documents within an organization.

                            Download: The definitive guide to document control and document management

                            Document control for renewables helps with compliance.

                            Proper document control helps renewable energy companies meet all relevant regulatory requirements and avoid fines or penalties. This can include:

                            • environmental impact assessments
                            • permit applications to health
                            • safety documents
                            • technical specifications

                            By implementing a robust document control system, companies can easily access and provide the necessary documents to regulators, showing that they comply with the law.

                            Benefits of document control for renewable energy

                            Renewable energy has emerged as a key solution as the world continues to grapple with the challenges of climate change. Organizations in this field are under pressure to:

                            • develop and implement new technologies
                            • meet strict regulatory requirements
                            • comply with regulators and other stakeholders

                            In this context, the importance of document control cannot be overstated. Effective document control ensures that projects and operations are on schedule, within budget, and to the required quality standards. Moreover, it gives stakeholders access to the right information at the right time, enabling them to make informed decisions and ultimately helping organizations meet their business objectives.

                            Renewable energy organizations relate to many complex projects and technical requirements. A practical document control system can improve efficiency and productivity. Access control provides quick and easy access to relevant documents. This can help reduce the time and resources spent searching for and retrieving documents, allowing employees to focus on more important tasks.

                            Next, it improves the quality and reliability of the company’s products or services. With revision control and document standardization, the stakeholders can focus and work on the correct version of a document, reducing errors or inconsistencies in the information. This can help prevent costly mistakes and improve the overall quality of the organization’s offerings.

                            Furthermore, an effective document control system can give a renewable energy company a competitive edge in the market. Companies can respond to customer or regulatory inquiries more quickly and efficiently by providing proper document storage and retrieval. This gives a reputation for reliability and professionalism. Therefore, the company can maintain and grow its customer base, increasing its market share and profitability.

                            Document control components for the renewable energy industry

                            So, what are the key components of a document control system for the renewable energy industry? The first and perhaps most important component is document numbering and naming conventions. This helps ensure that each document has a unique identifier and is easily recognizable, making it easy to find and retrieve when needed.

                            Another important component is revision control, which allows companies to track and control document changes over time. This ensures that employees are constantly working with the most up-to-date version of a document, reducing the risk of errors or inconsistencies.

                            Finally, effective document distribution and storage are crucial for ensuring people have access to the right documents at the right time. This includes digital storage systems and document distribution processes to employees and other stakeholders.

                            Summary

                            In conclusion, document control is an essential part of the renewable energy industry, which is crucial in ensuring regulatory compliance and providing numerous benefits to companies. With the right components in place, companies can effectively control and manage their documents, ensuring the success and sustainability of their organization.

                            Assai is a document control and document management system that helps renewable energy projects and operations. Check it out on our site, and feel free to book a demo!

                            Book a demo Get in touch

                            Want to know more? Download our latest material via the buttons below!

                          • New leadership for Assai

                            New leadership for Assai

                            Culemborg, the Netherlands, November 16th, 2022.

                            We are pleased to introduce Ludo Hertroijs as Chief Executive Officer of Assai, starting December 1st, 2022. Ludo brings unique skills, perspectives, and relationships to lead Assai into the future. He has over 10 years of management experience leading software companies such as IBS, Unit4, and Cloudwise.

                            Willem van der Jagt, Assai’s outgoing CEO, co-founded Assai in 1990. Under his management, Assai has evolved into a leading company for document control and management supporting engineering projects and assets worldwide. In 2019, Vortex Capital Partners made a majority investment in Assai. The partnership has brought Assai to the next level in product development, client relationships and organic growth. Now, Assai enters a new phase of growth.

                            Assai’s new phase

                            “In Ludo, we have found the right person to lead the company into the next stage of growth. Ludo will bring the required knowledge and experience, as he has a proven track record of leading and managing various IT companies. His management style truly appreciates success is built by the team and the clients, which is a core value of Assai.” Willem van der Jagt added. After the transition, Willem will remain an investor in Assai.

                            What can Assai clients expect?

                            We will continue to deliver an excellent quality of services as we keep developing the best document control and document management solution in the market. Our management will stay in place to ensure a smooth transition of leadership. Together with our developers, consultants and support team, we will provide the continuity and quality of Assai. We will keep investing in development, ensuring Assai is the right choice for now and in the future.

                            Excited to start

                            Ludo adds: “I am looking forward to building the organization and product with the team. We will keep client focus and continue to deliver outstanding services that have been and will remain the basis of the success of Assai.”

                          • Stay in control of your documentation with Assai and Power BI

                            Stay in control of your documentation with Assai and Power BI

                            Assai customers manage thousands of documents in our document management system (DMS). Think about technical design documents and drawings, vendor documentation, and corporate documents like policies and procedures. These documents are often related to large and complex engineering and construction projects in sectors such as oil and gas, sustainable energy, and infrastructure. Document management and document control in a centralized tool, with extensive sharing and workflow capabilities, offers significant advantages to end-users and the enterprise. These advantages include increased productivity, efficiency, quality, and information governance. Add to these, insights with a tool such as Power BI, and your possibilities become limitless!

                            One can imagine how challenging it is to keep an overview of all documents and other deliverables. For example, how can a document controller manage the actions and progress for hundreds of documents? Which contractors are lagging and hence causing a delay in the project progress? To complement the many Assai features that put you in control of your projects and operations, the Power BI reporting integration provides a very powerful solution to these typical challenges. Before diving into the features and advantages of Power BI, let us first briefly introduce this data visualization tool.

                            What is Power BI?

                            Power BI is a data visualization tool that enables users to develop reports and dashboards about practically any data stored in Assai. It includes features for data transformation (Extract – Transform – Load or “ETL” for the experts), data modeling, and data visualization. Furthermore, it offers data connectivity options to various database tools and applications. Users can interact with the reports in the cloud and on their own devices.

                            How do we at Assai offer value to our customers through Power BI? In the next section, we will discuss various ways in which we help our customers to get the reporting information from Assai, using Power BI, which they need to be in control of their projects and deliver them on time, within budget, with reduced risks and cost.

                            How can Power BI and Assai support your Document Control and Management?

                            1. An easier way to manage contractors and vendors
                            2. Less time-consuming, better documentation
                            3. The next level of data and document management
                            4. Stay updated with the data-refresh feature
                            5. Cloud and desktop sharing

                            Let’s dive in!

                            1. An easier way to manage contractors and vendors 

                            There are several advantages to using Power BI in combination with the Assai application. With this combination, the Document Controller can easily manage the performance of vendors. The image below shows, for every vendor related to a project, the total number of transmittals and the total number of transmittals delivered on time by the vendor. Vendors that do not deliver on time are marked red on the dashboard. The Power BI dashboard also shows the total number of transmittals late by month and by document status.

                            2. Less time-consuming, better documentation

                            Our Power BI templates also include features for document status management, as shown in the image below. There are multiple statuses related to a document. For example, IFA stands for Issued for Approval, and AFC stands for Approved for Construction. In Assai, every status is linked to a progress percentage. Documents are linked to a planned, forecast, and actual end date. The document progress can be measured by grouping the documents into work packages. Document Controllers can easily manage thousands of documents, statuses, and dates with our reports. Not only does it save time, since Excel dashboards are not required anymore, but it also increases the quality of the document delivery process.

                            3. The next level of data and document management with Power BI

                            Excel is a leading data analysis tool. However, Excel has some limitations, like the limited amount of data it can handle. Power BI can handle much larger amounts of data compared to Excel. This is especially advantageous for document management, with often thousands of documents, each with many metadata attributes and revisions, in multiple different projects (or assets). In practice, this means that Excel files are likely to crash when loading and visualizing the data, where Power BI files perform quickly and accurately. Furthermore, Power BI is often considered more user-friendly than Excel. It offers drag-and-drop data visualizations, which help users to develop and maintain their reports with fewer resources.

                            4. Stay updated with the data-refresh feature

                            Another capability of Power BI is the possibility of scheduling a data refresh. Daily, or more frequently if necessary. This can be done in the Power BI cloud environment. We can schedule the data refresh or assist the customer in doing it themselves. This means that the end-user does not have to hit a ‘Refresh’ button when using the report in the cloud.

                            5. Cloud and desktop sharing

                            As mentioned before, Power BI offers a desktop and a cloud version. The desktop application is meant for development, and the cloud version is meant for usage only. The data transformation, modeling, and visualization features are only available on Power BI desktop. Power BI cloud enables users, without any knowledge of the tool, to interact with the tables and visualizations. Any user with an account can log in and view the report, which enables scalability of dashboard usage in the organization. The Power BI reports can also be viewed from a mobile device through the app, which can be downloaded from the Android and iOS app store.



                            Implementation of Power BI and Assai

                            How do we implement Power BI for our customers? We provide a comprehensive set of templates and usually do not have to do much more, as it is easy for customers to make it meet their reporting requirements.  Power BI is a self-service tool that business users can build and modify reports. We assist in the data retrieval process and in fixing issues that come up in the development phase. In other cases, we build and develop dashboards for customers based on their needs. Not only do we develop the reports based on the customer’s requests, but we have also invested in our templates that can be implemented in a customer’s environment within days, provided that the requirements below are satisfied.

                            Power BI is the jackpot for document progress management. To benefit from all of this, there are three important requirements for a successful implementation of the tool:

                            1. Purchase of the Assai Rest API module. The Assai Rest API module provides data connectivity between the application database and Power BI. The module generates queries that can be easily copy-pasted into the tool.
                            2. The latest version of the Assai software. The Rest API structure often works best with the latest release of Assai.
                            3. Proper use of Assai software. As the saying goes: ‘Garbage in, garbage out’. This also holds true for our reports. Missing data, outdated data, or incorrect data cannot easily be fixed in Power BI, but should be fixed in the Assai tool.

                            We hope you found this article interesting and useful. Get in touch for more information about Assai’s business intelligence services.

                            Book a demo Get in touch

                            Want to explore more about Document Management and Document Control? Download our latest whitepaper and guide via the buttons below!

                            Whitepaper: What to consider when purchasing a DMS
                            The definitive guide to document control and document management